WIN-J · EVERYDAY & WORK TOOLS
Tile and deck-tile quantity calculator
Estimate tile pieces and boxes for multiple spaces. Set tile size, waste, joints and optional box price; distinguish area-based purchasing from a straight-grid reference.
Results
Apply extra once to the selected basis, round pieces up, then round to whole boxes. Area mode uses total area ÷ tile face area; grid mode totals each space’s columns × rows. Joints affect only the grid. Offcut reuse, diagonal patterns and mixed layouts are not optimized.
How to use
- Select room and tile units and enter one tile length and width.
- Add rectangular spaces, joint width, waste and tiles per box.
- Enter a box price only if you want a cost estimate.
- Review required pieces and boxes for the selected basis, compare both original quantities, and export CSV.
Example
For 3×2m, 30×30cm tiles, 10% extra and 10 tiles per box: 74 required pieces, 8 boxes / 80 purchased pieces. A 3mm-joint grid is 10×7=70 reference pieces.
Method and limitations
Area mode does not subtract joints and may undercount placements in small spaces or when offcuts cannot be reused. A 0.35×0.35m space with 30cm tiles and no gap rounds to 2 area-based pieces but 4 grid pieces. Each grid direction uses ceil((space+joint)/(tile+joint)). Check orientation, cut suitability and edge clearance on site. Tile dimensions 1mm–10m, spaces up to 1000m per side, extra 0–100%.
Frequently asked questions
Should I choose area or grid mode?
Use area mode for an area estimate when offcuts can be reused. Consider grid mode if offcuts cannot be reused or each deck-tile placement needs a whole piece. Extra is applied once to the selected original quantity.
Which quantities change when the joint width changes?
Only the original grid count uses joints. Area-based purchasing stays the same; purchasing may change when grid mode is selected.
Can I use deck tiles?
Yes for equal rectangular pieces. Check product requirements for connectors, wall clearance and cut edges.
Does a blank price mean zero cost?
No. Cost is marked not entered. Adhesive, grout and labor are excluded.